ADHESIVES FOR EXPANSION JOINTS


PRODUCT OVERVIEW

Bond Materials product EAC10-6 is an Epoxy asphalt cold-mix compound containing pre-blended mixtures of epoxy asphalt resins and aggregates for filling and repairing expansion joints. The finished products are loose solid particles packed in bags. For repair work, the compound is mixed with a “hardener-like” cement and water. The mixed compound is then poured into the expansion joint and compressed with a paving machine to produce a smooth, solid finish. After curing, the epoxy asphalt will become a polymer concrete. Epoxy asphalt cold mix compounds are high quality filling materials for expansion join, potholes etc in concrete pavements including epoxy asphalt polymer concrete and cementitious concrete.




APPLICATIONS

For all types of large buildings and structures, a certain gap will be reserved between some joining parts to form the expansion joints。 This is to allow thermal expansion and contraction without damaging the structure. The gap must be filled with some materials with good adhesion and elasticity to overcome the extrusion force caused by the deformation of the structure under the change of temperature. EAC 10-6 is a fast curing compounded product ideally for instant filling and repair expansion joints. The product is easy to apply and requires short maintenance time. The product has following features:

-  Cold mix (A & B components) with fast curing at ambient temperature, open traffic within 4 to 6 hours.

-  After fully cured, the compound is a highly durable polymer concrete.

-  Excellent product for instant filling & repairs of expansion joints and damaged areas on airport runways, polymer concrete pavements for cracked concrete road surfaces and potholes on steel bridges, freeways.



PRODUCTS



APPLICATION GUIDE

1. Cleaning:  Remove debris and dirt from the area to be patched. Clean surfaces thoroughly .

2. Applying Primer: Apply the epoxy asphalt primer on to the surface area to be repaired. The purpose is for water proofing and increasing its adhesion to the patching compounds.

3. Mixing: Mix thoroughly component A, the cold patching compound with curing agents.

4. Spreading: Spread the blended compound into the repair area within one hour

5. Compacting: When the material is half-cured (1 to 1.5 hour after spreading,use a compactor to compress to a solid flat surface.

6. Curing: Allow 4 to 6 hours of curing time before open to traffic.

TECHNICAL SPECIFICATIONS

PRODUCT CODE MARSHALL STABILITY (KN) MARSHALL FLOW AVLUE 0.10mm DYNAMIC STABILITY 70°C,次/mm
EAC – 106 45.5 35 12,300


APPLICATION CASES





ADHESIVES FOR EXPANSION JOINTS


PRODUCT OVERVIEW

Bond Materials product EAC10-6 is an Epoxy asphalt cold-mix compound containing pre-blended mixtures of epoxy asphalt resins and aggregates for filling and repairing expansion joints. The finished products are loose solid particles packed in bags. For repair work, the compound is mixed with a “hardener-like” cement and water. The mixed compound is then poured into the expansion joint and compressed with a paving machine to produce a smooth, solid finish. After curing, the epoxy asphalt will become a polymer concrete. Epoxy asphalt cold mix compounds are high quality filling materials for expansion join, potholes etc in concrete pavements including epoxy asphalt polymer concrete and cementitious concrete.




APPLICATIONS

For all types of large buildings and structures, a certain gap will be reserved between some joining parts to form the expansion joints。 This is to allow thermal expansion and contraction without damaging the structure. The gap must be filled with some materials with good adhesion and elasticity to overcome the extrusion force caused by the deformation of the structure under the change of temperature. EAC 10-6 is a fast curing compounded product ideally for instant filling and repair expansion joints. The product is easy to apply and requires short maintenance time. The product has following features:

-  Cold mix (A & B components) with fast curing at ambient temperature, open traffic within 4 to 6 hours.

-  After fully cured, the compound is a highly durable polymer concrete.

-  Excellent product for instant filling & repairs of expansion joints and damaged areas on airport runways, polymer concrete pavements for cracked concrete road surfaces and potholes on steel bridges, freeways.



PRODUCTS



APPLICATION GUIDE

1. Cleaning:  Remove debris and dirt from the area to be patched. Clean surfaces thoroughly .

2. Applying Primer: Apply the epoxy asphalt primer on to the surface area to be repaired. The purpose is for water proofing and increasing its adhesion to the patching compounds.

3. Mixing: Mix thoroughly component A, the cold patching compound with curing agents.

4. Spreading: Spread the blended compound into the repair area within one hour

5. Compacting: When the material is half-cured (1 to 1.5 hour after spreading,use a compactor to compress to a solid flat surface.

6. Curing: Allow 4 to 6 hours of curing time before open to traffic.

TECHNICAL SPECIFICATIONS

PRODUCT CODE MARSHALL STABILITY (KN) MARSHALL FLOW AVLUE 0.10mm DYNAMIC STABILITY 70°C,次/mm
EAC – 106 45.5 35 12,300


APPLICATION CASES




Contact us

Service Hotline:400 825 1528

Phone:+86-20-82210601

Fax:+86-20-82210626