PRIMERS
PRODUCT OVERVIEW
Epoxy asphalts have excellent waterproof, anti-corrosion and strong adhesion properties for all types of construction materials. COOLBOND® epoxy asphalt resin based primer is used for pre-coat treatment of the application surface to form a binding layer between the base and paving materials to achieve high performance properties.It is an ancillary material for road surfacing.
APPLICATIONS
COOLBOND® SC-601 Epoxy Asphalt Primer is a two-part products. Part A is made from the epoxy resin for outdoor use, petroleum pitch, thinner and other components, while Part B is from the oil asphalt, curing agent, accelerator, diligent and other additives. Products are mainly used in re-surfacing of old asphalt and concrete roads and bridge to create a waterproof bonding layer, firmly bond the asphalt surface or color pavement and the steel or concrete deck together.
PRODUCTS
APPLICATION GUIDE
1. Clean the application surfaces
2. Add Part A and B of this primer into a container at a ratio of 1:1 and mix thoroughly for 2 to 3 minutes and apply the mixture to the designated surface immediately.
3. Apply the epoxy (or color) asphalt surfacing materials.
4. Compact the surface after 3 hours.
5. The product is flammable, Keep away from open flames.
6. Avoid inhalation of solvent vapors
7. This product should be stored in a cool well-ventilated place. Avoid direct sunlight.
8. Application weather requirements: temperature> 5 ℃, relative humidity <85% before construction, Do no apply in rain.
TECHNICAL PARAMETERS
Parameters | Part A | Part B | Test Method |
Appearance | Brownish black liquid | Black liquid | visual inspection |
Water content % | ≤0.15 | ≤0.5 | GB/T 12008.6-1989 |
Relative density:(20℃)g/ml | 1.15±0.15 | 1.00±0.15 | GB/T 1884-1992 |
Ratio | 1 | 1 | |
25℃,100g Operation Time | 25min | GB/T7123-1986 | |
Initial curing time | 1.5-2h | ||
fully cured time | 24h |
|
Technical requirements for concrete bridge deck epoxy asphalt bonding layer materials
Parameters | Spec | Test Method |
> (MPa,20℃,500mm/min) Elongation strength,Mpa | ≥1.0 | GB/T 528-1998 |
Fracture elongation | ≥50 | GB/T 528-1998 |
Bond strength(MPa,20℃,与钢板) | ≥1.5 |
Application cases
PRIMERS
PRODUCT OVERVIEW
Epoxy asphalts have excellent waterproof, anti-corrosion and strong adhesion properties for all types of construction materials. COOLBOND® epoxy asphalt resin based primer is used for pre-coat treatment of the application surface to form a binding layer between the base and paving materials to achieve high performance properties.It is an ancillary material for road surfacing.
APPLICATIONS
COOLBOND® SC-601 Epoxy Asphalt Primer is a two-part products. Part A is made from the epoxy resin for outdoor use, petroleum pitch, thinner and other components, while Part B is from the oil asphalt, curing agent, accelerator, diligent and other additives. Products are mainly used in re-surfacing of old asphalt and concrete roads and bridge to create a waterproof bonding layer, firmly bond the asphalt surface or color pavement and the steel or concrete deck together.
PRODUCTS
APPLICATION GUIDE
1. Clean the application surfaces
2. Add Part A and B of this primer into a container at a ratio of 1:1 and mix thoroughly for 2 to 3 minutes and apply the mixture to the designated surface immediately.
3. Apply the epoxy (or color) asphalt surfacing materials.
4. Compact the surface after 3 hours.
5. The product is flammable, Keep away from open flames.
6. Avoid inhalation of solvent vapors
7. This product should be stored in a cool well-ventilated place. Avoid direct sunlight.
8. Application weather requirements: temperature> 5 ℃, relative humidity <85% before construction, Do no apply in rain.
TECHNICAL PARAMETERS
Parameters | Part A | Part B | Test Method |
Appearance | Brownish black liquid | Black liquid | visual inspection |
Water content % | ≤0.15 | ≤0.5 | GB/T 12008.6-1989 |
Relative density:(20℃)g/ml | 1.15±0.15 | 1.00±0.15 | GB/T 1884-1992 |
Ratio | 1 | 1 | |
25℃,100g Operation Time | 25min | GB/T7123-1986 | |
Initial curing time | 1.5-2h | ||
fully cured time | 24h |
|
Technical requirements for concrete bridge deck epoxy asphalt bonding layer materials
Parameters | Spec | Test Method |
> (MPa,20℃,500mm/min) Elongation strength,Mpa | ≥1.0 | GB/T 528-1998 |
Fracture elongation | ≥50 | GB/T 528-1998 |
Bond strength(MPa,20℃,与钢板) | ≥1.5 |
Application cases
Service Hotline:400 825 1528
Phone:+86-20-82210601
Fax:+86-20-82210626
Mailbox:sales@gzthebond.com